Kitchen Renovation Proposal

ESTIMAKER

PROPOSITION
0001

Residential Construction

Kitchen Renovation Proposal

Prepared for [client name]

1. Project Overview

Thank you for considering [company name] for your kitchen renovation at [project address]. This proposal covers the renovation of the existing kitchen into a functional, durable, and updated space for daily use. Our team will coordinate the work sequence, protect adjacent areas, and maintain an orderly jobsite throughout construction.

2. Scope of Work

The work includes removal of designated existing kitchen finishes and fixtures, preparation of walls and floors, framing adjustments for the approved layout, installation of new kitchen cabinetry, countertop installation, flooring installation, and final paint touch-ups. Electrical work included in this proposal is limited to the kitchen area and will be completed in accordance with applicable local codes.

Cabinet layout, finish selections, countertop material, flooring selection, appliance locations, and fixture locations will follow the final plans approved by [client name] before materials are ordered. Any work outside the approved scope, including concealed damage repairs or changes requested after approval, requires written authorization before proceeding.

3. Schedule and Site Coordination

Work is planned to begin on [project start date], subject to permit requirements, material availability, and site access. [Company name] will provide reasonable notice before major deliveries and coordinate access requirements with [client name]. The client will provide access to the property during agreed working hours and remove personal items from the kitchen and nearby work areas before construction begins.

4. Workmanship and Closeout

All work will be performed using standard trade practices and appropriate materials for the intended application. On completion, [company name] will remove construction debris generated by its work, complete a final walkthrough with [client name], and address documented punch-list items within a reasonable timeframe.

5. Payment Terms and Acceptance

A deposit is due upon acceptance to secure scheduling and begin material procurement. Progress payments will be invoiced as work is completed, with the final balance due after the final walkthrough. This proposal may be accepted by [client name] by signing below or by providing written approval to [company name] on or before [acceptance deadline]. Accepted by: [client name] Signature: [client signature] Date: [acceptance date]

Selective demolition and removal of existing kitchen cabinets, countertops, flooring, and designated finishes; includes jobsite protection and disposal of construction debris.3 200 $US
Kitchen framing and wall preparation, including layout adjustments, backing for cabinetry, and minor drywall repairs required for the approved kitchen plan.2 800 $US
Supply and installation of shaker-style kitchen cabinets, including base cabinets, wall cabinets, pantry storage, hardware, and professional leveling and fastening.9 500 $US
Supply and installation of quartz countertop with standard eased edge, cutouts for sink and cooktop, and silicone sealing at wall connections.6 525 $US
Supply and installation of luxury vinyl plank flooring, including subfloor preparation, underlayment, trim transitions, and finish cleanup.4 500 $US
Kitchen electrical rough-in and finish work, including new recessed lights, countertop receptacles, dedicated appliance circuits, switches, and final device installation.4 200 $US
Prime and paint kitchen walls, ceiling, trim, and repaired surfaces using durable interior paint in colors selected by [client name].1 800 $US
DOCX
Quote template preview

Construction Company Quote Template: Kitchen Renovation Proposal (Word)

This Kitchen Renovation Proposal Word template is a detailed quote document for construction companies, remodeling contractors, and general contractors bidding on residential kitchen projects. It sets out the scope, pricing, allowances, and project terms a homeowner needs before approving the work.

Use this kitchen remodel estimate template to bill for demolition, framing, plumbing, electrical work, cabinetry, countertops, flooring, finishes, and project management. It helps you separate labor from materials, identify owner-selected items, and present a clear total in US dollars without leaving costly assumptions open to interpretation.

Why use this kitchen renovation proposal template?

  • Define the scope clearly. List every included trade and task, from cabinet removal to backsplash installation, so the client understands exactly what the price covers.
  • Protect against change-order disputes. Record exclusions, allowances, and site assumptions before work begins. Hidden damage, code upgrades, and layout changes can then be priced separately.
  • Present professional pricing. Break down the proposal by phase or trade instead of sending a single lump-sum figure with no explanation.
  • Set payment expectations. Include the deposit, progress draws, final payment, and payment due dates in the same document as the construction quote.
  • Speed up client approval. A complete kitchen renovation estimate gives homeowners the information they need to compare proposals and sign with confidence.

What the template includes

  • Contractor and client details: Company name, license and insurance information, client contact details, jobsite address, proposal number, and issue date.
  • Project overview: A concise description of the planned kitchen renovation, such as a full gut remodel, cabinet replacement, or layout reconfiguration.
  • Detailed scope of work: Line items for demolition, debris disposal, rough carpentry, framing, drywall, painting, plumbing, electrical, HVAC modifications, and finish installation.
  • Cabinetry and finish schedule: Cabinet type, hardware, countertop material, backsplash, sink, faucet, flooring, lighting fixtures, and appliance-related work.
  • Labor and material pricing: Quantities, units, unit rates, labor charges, material costs, subcontractor costs, and line-item totals.
  • Allowances: Budget amounts for client-selected products such as cabinets, quartz countertops, tile, fixtures, and appliances.
  • Permits and inspections: Permit fees, plan review costs, required inspections, and responsibility for obtaining approvals.
  • Exclusions and assumptions: Items not included in the proposal, such as asbestos abatement, structural engineering, appliance supply, or concealed water damage.
  • Payment schedule and acceptance: Deposit amount, milestone payments, change-order process, proposal validity period, and signature lines.

How much to charge for a kitchen renovation

Kitchen remodeling quotes are usually priced as a fixed project price, supported by itemized labor, material, and allowance costs. Hourly or daily rates are useful for small repairs, exploratory work, and approved change orders. These are general North American price ranges to adjust for local labor rates, home age, finish level, and permit requirements.

  • Demolition and haul-away: typically $1,200 to $3,500 for a standard kitchen, depending on flooring, wall removal, and disposal access.
  • General labor: often estimated at $65 to $125 per labor hour or $500 to $900 per crew day, excluding specialty trades.
  • Cabinet installation: commonly $100 to $300 per linear foot for labor, depending on cabinet type, leveling needs, and custom modifications.
  • Countertop installation: around $60 to $150 per square foot installed for many quartz or granite selections; premium stone and complex layouts cost more.
  • Tile backsplash installation: generally $20 to $50 per square foot for labor and setting materials, before tile selection.
  • Electrical upgrades: often $1,500 to $5,000 for lighting, receptacles, dedicated appliance circuits, and panel-related work.
  • Plumbing relocation: typically $1,500 to $6,000 when moving supply lines, drains, or gas connections.

For a full kitchen remodel, show owner-selected finishes as allowances where final products have not been chosen. This prevents a $3,500 cabinet hardware or tile upgrade from being absorbed into your original contract price.

Who is this template for?

  • General contractors preparing a residential kitchen remodel proposal.
  • Kitchen and bath remodeling companies quoting turnkey renovations.
  • Construction companies coordinating subcontractors for plumbing, electrical, tile, and cabinetry.
  • Home improvement contractors bidding on cabinet, countertop, and flooring upgrades.
  • Design-build firms presenting a construction budget after the design phase.
  • Contractors revising a proposal after a site visit, client walkthrough, or scope change.

Frequently asked questions

Should a kitchen renovation proposal include allowances?

Yes. Allowances are useful when the homeowner has not selected cabinets, countertops, tile, fixtures, or appliances. State the allowance amount, what it covers, and how overages or credits will be handled once the final product is chosen.

Should I quote a fixed price or charge time and materials?

A fixed price is generally best for a defined kitchen renovation scope because homeowners expect a clear project budget. Use time and materials for investigation, emergency repairs, or work that cannot be accurately measured until walls, floors, or cabinets are opened.

What exclusions should I include in a kitchen remodel estimate?

Common exclusions include concealed mold or water damage, asbestos or lead remediation, structural repairs, engineering, utility upgrades, and appliance supply. Also clarify whether painting adjacent rooms, moving furniture, and restoring landscaping or exterior access areas are included.

How long should a kitchen renovation quote remain valid?

A validity period of 15 to 30 days is common, especially when cabinet, lumber, and finish-material prices may change. Note that pricing may be revised after that date or if the client changes the scope, selections, or project schedule.