Kitchen Renovation Proposal

ESTIMAKER

Your renovation plan

Turn Your Kitchen Into a Practical, Finished Space

Prepared for [nom du client] for the renovation of the kitchen at [adresse du chantier]. We manage the work from site protection through final walkthrough, with a clear scope and coordinated trades.

Included services

What Your Renovation Includes

A complete construction scope built to keep the project organized and the finished kitchen ready for daily use.

Protected Work Area

Floors and adjacent spaces are protected before demolition begins. Debris is removed as work progresses to keep the site controlled.

Coordinated Trades

Carpentry, electrical, plumbing, and finish work are sequenced by one project lead. You have a clear point of contact throughout construction.

Built for Daily Use

Cabinets, countertops, and utility connections are installed for reliable everyday performance. Details are checked before handover.

Clear Final Walkthrough

We review the completed work with you, address agreed punch-list items, and leave the work area ready for use.

Cabinetry is set and aligned before countertop templating and installation. Electrical and plumbing connections are completed after the new layout is in place. We keep you informed of key site milestones and access requirements during the renovation.

Project details

Questions Before You Approve

Answers to the practical points clients commonly review before work begins.

Project budget

Your Renovation Investment

The budget below sets out the construction scope and unit pricing for the kitchen renovation at [adresse du chantier].

Next step

Ready to Move Your Kitchen Forward?

Approve this proposal to confirm the scope. We will then schedule the pre-construction review, confirm site access, and prepare the project start.

WEB
Quote template preview

Building Contractor Proposal Template: Kitchen Renovation Proposal

This kitchen renovation proposal template helps building contractors present a clear, itemized scope and price for residential kitchen remodels. It is designed for contractors who need to send a professional proposal covering demolition, construction, finishes, subcontractor work, and project terms.

Use this building contractor estimate template to charge for labor, materials, cabinetry, countertops, flooring, electrical upgrades, plumbing changes, permits, and project management. It gives homeowners enough detail to compare options while protecting your scope from assumptions and unpriced change requests.

Why use this kitchen renovation proposal template

  • Define the exact scope of work. List what will be removed, built, installed, relocated, and finished, room by room.
  • Price labor and materials separately. Make allowances, supplied materials, client selections, and subcontractor costs easy to understand.
  • Reduce costly change-order disputes. State what is excluded, including concealed damage, structural repairs, asbestos remediation, and owner-supplied items.
  • Set a reliable payment schedule. Request a deposit, progress payments tied to milestones, and a final payment at substantial completion.
  • Present a more professional bid. A structured kitchen remodeling proposal makes it easier for homeowners to approve the work and sign quickly.

What the template includes

  • Contractor and client details: Your company name, license and insurance information, client contact details, property address, proposal number, and issue date.
  • Project overview: A short description of the kitchen remodel, such as a full gut renovation, cabinet replacement, layout update, or finish-only refresh.
  • Detailed scope of work: Demolition, debris removal, framing, drywall, insulation, painting, cabinet installation, trim, flooring, and final cleanup.
  • Electrical scope: New circuits, GFCI outlets, recessed lights, under-cabinet lighting, appliance connections, panel upgrades, and electrical permit work.
  • Plumbing scope: Sink and dishwasher connections, water line relocation, drain changes, shutoff valves, garbage disposal installation, and fixture hookups.
  • Materials and allowances: Cabinet allowance, quartz or granite countertop allowance, tile budget, fixture selections, hardware, appliances, and flooring materials.
  • Price breakdown: Labor, material costs, subcontractor pricing, permit fees, overhead, sales tax where applicable, and the total proposal amount.
  • Schedule and payment terms: Estimated start date, project duration, deposit amount, milestone payments, and conditions that may affect the schedule.
  • Exclusions and change orders: Work not included in the price and the written approval process for additions, substitutions, or unforeseen conditions.
  • Acceptance section: Proposal validity period, client signature lines, and authorization to proceed.

How much to charge for a kitchen renovation

Kitchen renovation pricing depends on the kitchen size, layout changes, finish level, local labor rates, and permit requirements. Use these figures as North American pricing guidelines and adjust them to your market, crew costs, and selected materials.

  • Demolition and haul-away: typically $1,200 to $3,500 for a standard kitchen, depending on flooring, soffits, wall removal, and disposal access.
  • General contractor labor: often priced at $65 to $125 per labor hour, or included as a fixed project-management and construction price.
  • Cabinet installation: commonly $100 to $250 per linear foot for installation labor, excluding the cabinets themselves.
  • Stock and semi-custom cabinets: allow roughly $5,000 to $18,000; custom cabinetry can exceed $25,000.
  • Countertops: laminate may start near $50 per square foot installed, while quartz and granite commonly run $90 to $180 per square foot installed.
  • Tile backsplash installation: generally $20 to $50 per square foot, plus tile, grout, trim, and substrate preparation.
  • Electrical work: budget $1,500 to $6,000 for lighting, receptacles, appliance circuits, and code upgrades; a panel upgrade is usually priced separately.
  • Plumbing relocation: allow $1,200 to $5,000 when moving sink, dishwasher, water, or drain lines.

For a full mid-range kitchen remodel, a proposal may fall between $25,000 and $65,000. Structural alterations, premium appliances, custom millwork, and major utility relocation can raise the total substantially.

Who this proposal template is for

  • General contractors bidding on residential kitchen remodels.
  • Remodeling contractors managing demolition, carpentry, finishes, and subcontractors.
  • Design-build firms presenting a construction price after kitchen design approval.
  • Home improvement contractors quoting cabinet, countertop, flooring, or layout renovation packages.
  • Builders and renovation specialists handling kitchen upgrades before resale, rental turnover, or move-in.

Frequently asked questions

Should I include appliances in a kitchen renovation proposal?

Include appliances only if you are supplying and purchasing them. If the homeowner is buying appliances directly, list them as owner-supplied and specify that your price covers delivery coordination and installation only, if applicable.

How should I handle cabinet and countertop selections that are not final?

Use a clearly labeled allowance, such as a $10,000 cabinet allowance or $4,500 countertop allowance. State that any amount above or below the allowance will be adjusted through a written change order before installation.

What exclusions should a kitchen remodeling proposal include?

Exclude concealed water damage, mold, asbestos, termite damage, structural deficiencies, and code corrections that cannot be identified before demolition. Also clarify whether design fees, engineering, permit fees, appliance purchases, and painting outside the kitchen are included.

When should I request payment for a kitchen renovation?

A common structure includes a deposit at signing, followed by progress payments after demolition, rough-in work, cabinet delivery or installation, and final completion. Tie each payment to a defined milestone rather than vague calendar dates, and state that approved change orders are billed separately.